Present: P Douglas, J Christie, L Birrell, R Pegden, J Fairbairn, F Edward
Apologies: P Duncan

1) Matters arising
Boarhills road signs. Gordon Hughes from Fife Council has been in touch and is going to look into the matter. The lack of visibility at the Peekie road end was discussed, and it was suggested that the high hedges at Kinglassie were possibly limiting vision.
Flooding at Cardean. The drains will be jetted out in the future, but the current problem is not being helped by road sweepings being brushed down them.

2) Dunino topics
The bridge at Stravithie Mill Following a redesign to reduce the flood risk, this work is now rescheduled for Jan to May next year, and is likely to require a complete closure of the bridge for one week in Jan and another in May. There will also be a width restriction at other times, which may mean diverting buses. The diversion routes have not yet been finalised.
The Lathockar- Stravithie road. Verges have had spoil from ditches heaped up on them, which is at least temporarily very unsightly. A lay by is required between Pittendriech and Bannafield to allow larger vehicles to pass.

3) Boarhills Village Hall issues
None


4) Date of next meeting

MONDAY 10 OCTOBER 2005, BOARHILLS, 7.30PM